Risk Identification and Management in Investment Projects: Evidence from Real-World Projects
Keywords:
Keywords: project risk management; risk identification; investment projects; cost overrun; reference class forecasting; optimism bias; megaprojectsAbstract
Investment projects routinely miss their planned cost, schedule and benefit targets, yet risk identification—the first and most consequential stage of risk management—remains weakly grounded in empirical evidence. This study examines how risks materialise in real-world investment projects and which failures of risk identification best explain the observed outcomes. Using a structured secondary-data analysis, we synthesise ex post evidence from six empirical studies: a database of more than 16,000 completed projects, three sector datasets (transport, dams, electricity infrastructure) and a survey of 701 project managers. Outcomes are compared by prevalence, magnitude, dispersion and, where reported, schedule and benefit indicators; coefficients of variation and mean-to-median ratios are derived from published statistics. The results show that overruns are the norm (three-quarters to nine-tenths of projects in the sector datasets exceed their cost estimates; only 8.5% of projects meet both cost and schedule targets), that outcome distributions are strongly right-skewed (mean cost overrun of 96% against a median of 27% for large dams), that forecasting accuracy has not improved over time, and that even moderate risk-management planning weakens the negative effect of risk on project success. We propose a three-layer risk identification gap framework (epistemic, behavioural and structural), derive testable propositions and formulate practical recommendations for investors and project sponsors. The findings are limited by reliance on published data dominated by large public and energy projects.
References
1.Ansar, A., Flyvbjerg, B., Budzier, A., & Lunn, D. (2014). Should we build more large dams? The actual costs of hydropower megaproject development. Energy Policy, 69, 43–56. https://doi.org/10.1016/j.enpol.2013.10.069
2.Flyvbjerg, B. (2006). From Nobel Prize to project management: Getting risks right. Project Management Journal, 37(3), 5–15.
3.Flyvbjerg, B. (2014). What you should know about megaprojects and why: An overview. Project Management Journal, 45(2), 6–19.
4.Flyvbjerg, B. (2021). Top ten behavioral biases in project management: An overview. Project Management Journal, 52(6), 531–546.
5.Flyvbjerg, B., Bruzelius, N., & Rothengatter, W. (2003). Megaprojects and risk: An anatomy of ambition. Cambridge University Press.
6.Flyvbjerg, B., & Gardner, D. (2023). How big things get done: The surprising factors behind every successful project, from home renovations to space exploration. Currency.
7.Flyvbjerg, B., Holm, M. K. S., & Buhl, S. L. (2002). Underestimating costs in public works projects: Error or lie? Journal of the American Planning Association, 68(3), 279–295. https://doi.org/10.1080/01944360208976273
8.Flyvbjerg, B., Holm, M. K. S., & Buhl, S. L. (2005). How (in)accurate are demand forecasts in public works projects? The case of transportation. Journal of the American Planning Association, 71(2), 131–146.
9.Hillson, D. (2002). Extending the risk process to manage opportunities. International Journal of Project Management, 20(3), 235–240.
10.International Organization for Standardization. (2018). Risk management—Guidelines (ISO Standard No. 31000:2018).
11.Kahneman, D., & Lovallo, D. (1993). Timid choices and bold forecasts: A cognitive perspective on risk taking. Management Science, 39(1), 17–31.
12.Kahneman, D., & Tversky, A. (1979). Intuitive prediction: Biases and corrective procedures. TIMS Studies in Management Science, 12, 313–327.
13.Klein, G. (2007). Performing a project premortem. Harvard Business Review, 85(9), 18–19.
14.Lovallo, D., & Kahneman, D. (2003). Delusions of success: How optimism undermines executives’ decisions. Harvard Business Review, 81(7), 56–63.
15.Project Management Institute. (2017). A guide to the project management body of knowledge (PMBOK® guide) (6th ed.).
16.Sovacool, B. K., Gilbert, A., & Nugent, D. (2014). An international comparative assessment of construction cost overruns for electricity infrastructure. Energy Research & Social Science, 3, 152–160.
17.Zwikael, O., & Ahn, M. (2011). The effectiveness of risk management: An analysis of project risk planning across industries and countries. Risk Analysis, 31(1), 25–37. https://doi.org/10.1111/j.1539-6924.2010.01470.x